Daijiworld Media Network - Mangaluru (SHP)
Mangaluru, Jul 27: The fifth list containing the schedule of Vande Bharat flights has been announced. According to sources, as many as seven flights will conduct their operations from Mangaluru airport in the first two weeks of August.
On August 5, the first flight will take off from Mangaluru airport at 12.40 pm and arrive at Dubai, Terminal 2 at 14.30 pm.
The second flight is scheduled to depart from Mangaluru airport on August 6 at 12.40 pm and arrive at Dubai, Terminal 2 at 14.30 pm.
Similarly, after a two-day gap, a third flight will take off from Mangaluru airport on August 9 at 12.40 pm and arrive at Dubai, Terminal 2 at 14.30 pm.
In between the flight operations from Mangaluru to Dubai, there will be a flight to Sharjah on August 8 at 11.05 am from Mangaluru airport. It will reach Sharjah airport later that day at 13.00 pm.
The second flight to Sharjah will conduct operation after close to a week on August 15. The flight will take off from Mangaluru airport at 11.05 am and arrive at Sharjah airport at 13.00 pm.
On the other hand, a flight to Abu Dhabi is scheduled to depart from the Mangaluru airport on August 7 at 12.40 and arrive at the Abu Dhabi airport at 14.30 pm.
There will be one other flight from Mangaluru after a seven-day period on August 14 at 12.40 to Abu Dhabi airport. It will reach the airport later that day at 14.30 pm.
All the above said departure dates and time will be uploaded on the official site soon after confirmation.